I am Sub Engineer M A. I feel to share my memories of College and 12 year Experience with all of them which are those interested or related with Civil Technology.
I try to permute my experience as Civil Technology Blogs.
I request all of you if you are like my efforts , so please write your precious comments.You are share to my site with your friend and drop a massage in ''Contact us'' page.I try to solve issues and improve my skills with your comments.
Projects :
- Capital Tower Plaza Lahore
- BARZAN ONSHORE PROJECT QATAR
- DHQ HOSPITAL BAGH AZAD Kashmir
- enVen-1.3 Expansion Project Dharki Pakistan
- (The World Largest Ammonia Urea Complex.)
- Gull Paper Mill Kotri Sind.
- A-One Feed Mill Hyderabad Sind.
- Mirchi Factory Hyderabad Sind.
- Khawaja Feed Mill Multan.
- SADIQ BROTHER Hatchery Raheem Yar Khan.
BUILDING CONSTRUCTION
- Supervision of building construction such as (Brick masonry, hollow concrete block masonry, Reinforced brick masonry )
- Supervision of flooring work ( Cement concrete flooring ,tiled flooring , marble flooring , Wood Flooring , Wall tile & Dado work )
- Supervision of plastering and pointing work ,Vynial & plastic Amulsion painting, distempering and white wash activities.
- Supervision of Gypsum Board & Cement Board & Ply Wood Partition Walls ,Wooden Cladding work & Aluminum Cladding activities.
- Supervision of Stair Railing With SS & MS Material.
- Supervision of False Ceiling Work.
RCC STRUCTURE
- Supervision of carpentry work like that Footings , Column,
- Slab Formwork, Walls Formwork, Overhead Tank & Septic Tank Formwork, Slip Form working For Prilling Tower.
- Supervision of Concrete work like that Footings , Columns
- Slabs , Walls , Overhead Tank & Septic Tank .
- Supervision of Steel work like that Footings , Columns
- Slabs , Walls , Overhead Tank & Septic Tank.
- Estimating of Steel , Concrete Material & Form work and Demands before work staring work.
- Supervision in construction work of load bearing walls, partition walls ,lintel and upper floors, stairs ,roofs and roof covering.
- Supervision of Towers Structure such as (Tower Foundation Template, Anchor Bolts, Tower Erection, Retaining walls. Making four Week Look.
- Responsible for timely execution for the monthly set targets with the limited construction resources.
- Effective Management & utilization of the construction resources. Participation in weekly execution meeting. Giving guidance on safe execution of the different construction activities.
- Giving weekly & monthly progress report to site construction manager.
EARTH WORK
- I am working as a job on above mention project is below that
- 1, Estimators - Earthworks Excavations and Road Works
- Earth work done in plant area layer by layer and FDT test requires of each layer.
- Earth work job done by equipments like Grader ,Loader, Roller, Water tanker,
- Excavator and JCB , Crushing plant for back filing material.
- Roadwork is important subject so it is very important for me, to check sub grade material and compaction of sub grade ,base is very important for me. Estimate the quantity of backfill material and Asphalt material .Maintain the Road levels and slopes.
- Excavation and shoring work. In plant ,excavation is very dangerous activity and JGC company announce ma as expert excavation person and I have a card.
lot of thanks for visiting my Blogs.
Yar ya tum ho..aj Kal kehn ho...
ReplyDelete